How are we in June already? The days in April and May were such a blur. We spent most of the April researching about basement renovation, interviewing contractors, and comparing bids. May was entirely devoted to making decisions on everything basement bath-related. Slav has been busy with his work during this whole time, and somehow we still managed to celebrate a birthday with friends.
The basement reno has picked up the pace. I’ve shown you the demo in the living room, bedroom, and bathroom,Β the installation of the egress window, the new electrical panel and recessed lighting, and how we sound proofed the basement. This week we crossed finishing line of framing and plumbing, which gave us a lot better idea of the new layout.
1. The bathroom
To expand the bathroom we demoed the hallway closet, which I briefly talked about here. The goal is to accommodate a double-sink vanity in here.
The shower area
The shower will remain at the end of the room, with the shower head on the left side. A double-sink vanity will be placed next to the shower on the wet wall, and a medicine cabinet will be installed above the vanity and under the soffit.
The toilet will locate under the air duct and close to the doorways. I am not a big fan on having the toilet next to the door, but we’d rather place toilet but not the vanity under the low ceiling.
We are in the process of picking out the tiles for the bathroom. We have basically narrowed down to using two tiles, a large dark one on one wall and the floor, with a white subway tiles on the other three walls.
2. The master bedroom
By removing the closet wall used to divide the two bedrooms, we created a big and long bedroom. The I beam has been boxed in and will be drywall-ed over, which creates a natural divider to separate the sleeping area from the closet area.
Under the egress window will be our sleeping area. We decided to put the king bed on the wall adjacent to the backyard for less noise, more fresh air, and east facing windows. The bed will be centered on the east wall of the master and flanked by the floating nightstands I built last year. The column to the right envelopes of the supporting columns for the I beam. I am considering putting a skinny bookshelf on the left to mirror the column on the right, which along with the I-beam creates the look of a sleeping nook.
This is the view from the living room, through the two bathroom doors, into the bedroom. It will be a simple but comfortable space to nest.
The front side of the bedroom, which is next to the front yard and under Slav’s office, will become a closet area. We plan to align wardrobe cabinets along the wall on both sides, which will provide more storage space than we currently have in the bedroom closets.
3. The utility room
The last big changed we made is to remove the wall between the living room and the utility room. Remember the old laundry/utility room when we moved in? It was just a small hallway and hard to even open the dryer door. We first demoed a bedroom there to open up the utility area, and now with the living room wall coming down, we have the entire place opened up to the living room.
We do plan to frame an utility room closet down the road to enclose the furnace and the water heater, and add a countertop on top of the washer/dryer. The small closet under the stairs will remain as a storage space.
4. The living room
Compared to other rooms, the living area changed the least. Aside from losing a wall, the only change is to add recessing lights and sound proofing in the ceiling. Instead of making this another living room, we will likely using it as a media/reading room. Before the sound proofing material went in the ceiling, electrical and Ethernet for TV box and projector had been put in. Slav has big plans for this space, and all I am responsible for is choosing a big and comfortable sofa down here. It will be a great room for late evening movies and friends to gather, but for rest of the year this big and empty room will probably remain big and empty.
The month of June will be hanging the drywall and tiling the bathroom, which will be done by a contractor. We will take the torch in July, after the drywall is finished.Β Before moving down here we still need to paint, figure out clothes storage, and hopefully install some flooring at least in the bedroom before we move down here. We are far from fruition now, so it is hard to imagine to have smooth drywall and functional toilet again. There are still lots of decision to make (paint! shower doors! floors!)Β and lots of little things to consider (tower bars! toilet holders! bathroom storage!). And I am trying to pump the optimism by keeping myself busy shopping. Cannot wait for everything to be over!