Home Stay + Spring Cleaning

Spring cleaning at home

Hi friends! I hope you all had a good weekend, at least as good as it could be. It is hard to ignore the crazy pandemic, but we managed to stay stress-free and did not run into any trouble shopping. We do, however, start working from home in response to the “social distancing” order, which saves me hours on commute. With nothing else to do I got into Spring cleaning – for the first time in my life! All the surface was wiped down, every blanket was washed, and bathrooms got their fair share of scrubbing bubbles. With 60 degrees and sunny weather I had the windows open for the weekend. It feels like Spring!

After cleaning inside the house I quickly moved onto the garage. Our garage is a true work horse especially in winter months. Without working in it we just use it as an enclosed dumpster. Winter sport gear, shoes, tools, construction material and demolition trash are everywhere. It needs an organization badly.

The dump ground – we are animals

IMG_0643

IMG_0642

IMG_0644

IMG_0648

IMG_0650

Lots to store

I spent two days just to sort things out. Every storage box was open and every item now has my finger prints on it. Disposables, out to the trash/recycle. Donation items, out into my car. Gifts, packed and shipped! The garage started looking a lot better, but the real devil is how to store all the rest.

We had organized our garage before and divided it into multiple zones: paint storage, car repair and DIY tools, sport gears, and mud room area. But the recent basement renovation left us a lot of materials we have to keep. For example, the leftover tiles, paint, drywall, and flooring, all of which should be kept in case of future repairs.

IMG_0649

In addition, we also plan to keep the lumber from demolition.

IMG_0654

IMG_0665

For the basement reno we also acquired more tools, including a Dewalt miter saw + saw stand. We had already owned lots of tools, both for DIY projects and for car repair/maintenance. And they have been piling on top of each other and getting lost in deep drawers.

I spent the entire third day getting everything out. Dust, categorize, and re-organize them into drawers and onto shelves.

IMG_0666

IMG_0669

We had one of the wall organizers (left) which works really well for storing small parts. I got another one (right) and have everything labeled.

IMG_0705

Aside from general storage, I mounted several magnetic racks to hold small tools in open.

IMG_0661

IMG_0662

Now at least I know exactly what tools we have and where everything is. Hopefully it will save us time and money from going to stores to buy things we already have.

Adding more shelves and create a wood working station

Shortly after moving in, we mounted a series of storage shelves on the southern wall to hold paint supplies, which have worked wonderfully.

IMG_0689

Soon after that, we added more shelves on the other end of the southern wall for seasonal storage, which we use to store things related to specific project – cycling gear, dog stuff, etc.

IMG_0674

To create more storage like this, I extended the upper storage shelf to run above the garage window for mostly wood working tools.

IMG_0675

Below the window used to be our construction storage. Now all the lumber was moved away, I took the opportunity to carve out a space for wood working. We regularly use the Bosch table saw and the Dewalt miter saw. They are wonderful tools, but difficult to setup. Sometimes we opted out using them purely because we were too lazy to set them up. To make sure these tools are readily available, I placed them next to each other, right under the garage window.

IMG_0672

This is a great spot for wood working tools. The lighting is good with the window (the white board is there temporarily). There is a wall outlet right between them, and the shelves holding all the paint cans and wood treatment are just an arm away.

IMG_0701

IMG_0680

We have a piece of pegboard left over from the east wall project. Adhering to the “use it or lose it” rule, I mounted it under the window and it fits perfectly! It is a great spot to store protective gear for wood working.

IMG_0677

Keep the north wall for sport storage and as a mud room

The last wall in our garage is the north wall, shared between the garage and the living room/kitchen. It has been used for winter gear storage with a DIY ski rack:

IMG_0696

next to which is hanging space and shoe storage as a mudroom area.

IMG_0711

What is next?

Now the garage has been organized again, in the best way I can, we have yet to find storage for two more categories of things: Christmas decorations, and lumber.

IMG_0664

So naturally, I decide to use these lumber to created more storage in the garage for Christmas stuff – a one-stone-two-birds approach. Why not? And we happen to have this ugly corner above the roof trusses to cover up…Do you see where I am going with this?

IMG_0684

My next project will be to created storage above the trusses using the lumber we have, not only to conceal the electrical wires, but also to provide space for Christmas decors. Hopefully by the end of the week, we will be able to park a car, maybe even two cars, back to the garage again! Who would know?

IMG_0699

The Utility Room: It Is All About Plumbing

Two weeks have passed since we started working on the basement utility room. We’ve been busy!

First things first, Slav demoed the last bit old drywall in the utility room. Our house is finally purple wall-free.

IMG_0617

Without the big block of purple color, the space immediately felt lovely. I actually do not mind the concrete wall look. But to adhere to the new building codes we have to insulate to R-19. So new framing and drywall there will be.

IMG_0618

We also ripped out the drywall in the closet. Slav hates textured walls. It is just cheaper to re-drywall than to skim coat everything.

IMG_0621

The new framing will be 2″x 4″ in the closet, so the finished wall will be flush with the front of the electrical panel.

IMG_0619

Re-drywall also presents an opportunity to add soundproof insulation under the stairs.

IMG_0620

But the biggest progress we’ve made was plumbing. The plumber who finished our master bath came out again and spent three long days in the utility room. We did many small upgrades. Although pipes behind the wall are not my favorite subject to spend money on, it is worth noting the purpose behind every bit of plumbing projects we’ve completed.

1. Installing a new floor drain

A full day of work was dedicated to replacing the floor drain. Floor drain is required by building code in laundry rooms and close to water tank. But ours has been malfunctional since the day we moved in.

02

Not only the old drain was rusted and clogged, its location also inconvenienced us. Sitting far from the wall, the concrete slab around it sloped down significantly towards the drain. The uneven slab prevents us from continuing the LVP flooring from the rest of the basement into the utility room.

01

We decided to move the floor drain to one corner of the room so we can lay floors down the road. At the mean time, the old rusty drain would be replaced with a new PVC drain.

03

The new drain would be set near the furnace and tankless water heater, near the condensation pump on the floor. By relocating it we will be able to eliminate the condensation pump completely.

04

Although we are moving the floor drain by merely a few feet, the work involves breaking the concrete slab between the two locations and re-pouring the slab. Along with the material for the new drain, this work cost us ~$1800 including demo, debris removal, plumbing parts, gravel, concrete, and a day of our plumber’s labor.

05

As soon as the sewer line was exposed, we knew why the drain was not working – the underground serer pipe has cracked and was inevitably filled with dirt. The drain pipe actually came out in two pieces.

06

08

Our plumber cut off the old pipe close to the new location, and installed the new drain.

09

10

After laying down a gravel base, concrete was poured and leveled to patch the floor.

13_

Look at the new drain! Once the utility closet is built the drain along with the furnace and water heater will be concealed from the rest of the room.

12

2. The water main upgrade

18

As our plumber came in for the floor drain quote, he also suggested a few upgrades, including installing a pressure reducing valve on our main water line.

14

Pictured above was the main water line for our house. Water comes into the house from the bottom and below the shut-off valve, and runs up into the basement ceiling then to the wet wall. As you can see, we did not have a way to regulate the water pressure coming from the street. The gate valve in the picture above is an all-of-none shut-off.

After testing, our house receives 80~90 psi water pressure, which is higher than usual (70~80 psi). Higher water pressure can damage household appliances such as clothes washer and dishwasher, as well as reduce the lifespan of plumbing parts such as shower valve. To reduce water pressure, we needed a pressure reducing valve (PRV).

15

Our plumber installed the PRV to hold the water pressure around 75 psi, and isolated the valve with two new ball-style shut-offs installed above and below.

3. New outdoor faucet

17

Our front yard water faucet is fairly close to the main water line and has been leaking since we moved in. As the plumber worked on the pressure reducing valve, we asked him to replace the outdoor water faucet as well.

New faucet outside of the house:

IMG_0634

New connection inside:

17_

To work on the water main and outdoor faucet, we had to cut in the new drywall Slav installed (1, 2) and I painted. SAD! After the plumbing work we have been working on patching the drywall. We will be using a electrical access panel (2nd hand for $10!) to allow future access to the pressure reducing valve.

IMG_0622

4. Upgrading/upsizing the main water line

Since the ceiling is open, we also replaced the copper waterline with PVC. The old pipe was installed below the floor joists at places and held up by metal screws/brackets. Metal contact on copper line, regardless water or gas, is a big no-no as the contact point will slowly corrode and develop leaks. Our plumber replaced all the copper line he could see with PVC and raised the new line to be flush with the floor joists.

The old copper line held by metal screws:

19

The new PVC held by plastic straps:

20

5. Upgrading the waterlines for the main floor bathroom

Since the wet wall will be partially covered by the end of the utility room renovation, we decided to replace as much as plumbing for the upstairs floor bathroom and kitchen as possible. The picture below revealed two problems for the upstairs plumbing: the contact between copper line and sewer line, and undersized pipe.

21

This pictured vertical copper pipe is a cold water pipe that supplies the upstairs toilet. It used to feed the water heater below, but the line has been capped when Slav installed the tankless water heater. However, the copper water pipe remains on top of the sewage line due to the narrow space. This contact has been something that keeps us up at night (how adult…).

In addition, the waterline to the right was narrower than the left. Since the horizontal line is where majority of the water travels, It should remain 1/2″ pipe as apposed to the 1/4″ our old plumber used. To fix both issues, we decided to replacing this copper connection completely all the way up to the upstairs toilet, and replace the waterline to 1/2″ throughout.

IMG_0638

As you can see, our plumber upsized the main line and the new line is no longer touching and rubbing on the sewage line.

As a result, we now have a new water line to the upstairs toilet.

IMG_0635

We did have to cut out the bathroom drywall for the work, but this bath’s days are numbered too, so it is OK. The new water line will functional a lot better for us down the road, compared to the old line:

IMG_0625

6. Replacing the outdoor faucet at the back the house

Running down the line, literally, we also replaced the outdoor faucet at the back of the house. Slav took this opportunity and installed a new vent cover for the bathroom fan. The back of the house looks instantly better.

IMG_0631

I do not have a closeup before picture at this location, but you can get an idea how messy it looked from this old shot shortly after we moved in:

IMG_8615

Remember the old window well? I did not. Wow that was bad. But anyway, let us focus on the very left side of the photo. From left to right we have  1. dryer vent, 2. telephone box, 3. old water faucet, and 4. bathroom fan vent. Slav took off the telephone box off and installed a new vent cap for the bathroom fan vent, which completely upgraded the look of this area.

7. Upgrading the kitchen plumbing

The last plumbing project was to upgrade the plumbing for upstairs kitchen, which includes replacing the sewage pipe all the way to under the sink, and replacing cold and hot water supply to the upstairs sink.

30

The old sewer pipe with rusted clean out is made of copper and was replaced with new PVC pipe and a new clean out:

35

Our plumber installed the Y connection (for ventilation) sideways for easy framing.

36

Continue up the under-the-sink sewer pipe was replaced too. It was a huge mess in the sink cabinet:

23

Both water lines and the sewer pipe were in serious despair. There must have been leaks and the entire cabinet and the wall behind was rotten and covered by mold. Cannot wait to replace all of them!

24

28

Drywall tape held the connection to the garbage disposal. I faint…

26

And look at the new stuff! Apparently the new practice is to run the sewer and water lines through the floor, which brings less disruption of the sink cabinets. Smart!

31

The new water lines:

34

What a sharp contrast between old and new sewer pipes:

Before

25

After!

32

The new waterlines were also raised into the floor joists, which will make drywall the ceiling easier.

IMG_0639

Whereas the old lines were below the floor joists:

29

What’s next

By crossing off plumbing upgrade from the list, we are ready for framing and drywall! All the framing and drywall finish will be performed by a new GC which will start in April. Then we can take over in May to paint and install flooring. It is tough to wait another month to see new progress, but it also gave me time to finish designing the space and start looking at furniture. Stay tuned!

1. Demo the remaining purple drywall and drywall in the closet;
2. Replace plumbing needed and move the floor drain;
3. Framing walls, soffit when necessary, and add a pocket door to the closet;
4. Frame a floor-to-ceiling utility closet to conceal the furnace and water heater;
5. Electrical work necessary;
6. Insulate and drywall the ceilings and walls;
7. Paint the ceilings and walls;
8. Continue the NuCore flooring from the media room to the utility room;
9. Install trims and baseboard throughout the basement;
10. Create a laundry nook with cabinet storage.

The Utility Room Reno Starts!

Now the dust has settled (literally) in the master suite, Slav and I ask ourselves, “what’s next?” Without hesitation, we both knew it will be the utility room.

IMG_9654

It is time to tiny up

Do not get me wrong, there are quite a few rooms that need attention. But the utility room rise to the top of the list as soon as rest of the basement was finished. After all, it is the last room to remodel in the lower level, and it is connected to the finished media room with a big opening.

IMG_9645

The rough state of the utility room actually prevents us from using the media room as it’s intended. Knowing there will be more drywall dust when we renovate this room, we do not want to furnish the media room just yet.

IMG_9648

Quite frankly, walking downstairs and still seeing bare studs and furnace ducts are getting old. It downplayed all the hard work we’ve done in the rest of the basement. “Curb your enthusiasm” it does.

IMG_9653

Longest in making: the initial demo

Interestingly, this utility room is the longest in making among all spaces. When we moved into the house in the summer of 2017, this space was divided into two rooms, a laundry niche and a bedroom painted purple.

IMG_6902

IMG_6905

This bedroom was not up to code at all. And we do not need 5 bedrooms (!) in this house. We started demoing this space shortly after moving in, starting with the HVAC installation to accommodate the new ducting. It was 2.5 years ago!

IMG_9040

Soon after, Slav removed the dividing wall between the laundry niche and the purple bedroom. Finally, doing laundry with washer and dryer doors fully open!

IMG_9149

I immediately started brainstorming what this room could be used for. The first plan came to mind was to add a small kitchenette. You can see my blue tape on the wall indicating a sink cabinet.

We also proceeded to remove the drywall and soffit on the utility wall to expose the plumbing. It made the master bath renovation later a lot easier.

IMG_5761

Just like that, I had the luxury to do laundry in the most spacious utility room I’ve eve had. This utility room measures 12″ x 16″, bigger than any of our bedrooms.

Create an open floorplan

Fast forward to a year ago, before renovating the basement, we removed the drywall between the media room and the utility room to expose the I-beam.

IMG_5803

Then the framing below was gone too.

IMG_8913

As part of the media room finish, the drywall was back up and a new opening was established.

IMG_9490

It already looked a lot better, but we are ready to get it completely polished. If you have lived with renovation, you will likely agree that having a finished space that can be completely closed off from construction zones is essential for one’s sanity. Finishing this utility room will give us a finished basement that is isolated from the main floor, which is just that.

Kitchenette or not, it is a question.

To date, the utility room houses the furnace, the tankless water heater, and the washer and dryer.

IMG_9647

On the other side of the room, a closet hosts the new electrical sub-panel for the basement.

IMG_9651

For the longest time, I was convinced that we should turn this space into a dry kitchen. If you are not familiar with the concept of dry kitchen – it is very common in some culture to have two kitchens, one for washing and cooking, which produces moisture and smoke, and one for serving drinks and snacks, which remains relatively clean and odorless. The latter is called a dry kitchen. Small appliances such as microwave, toaster, and coffee machine can stay in the dry kitchen for easy access, whereas refrigerator and cooktop usually remain in the cook’s kitchen.

These two kitchens are often connected. The cook’s kitchen can usually be closed off with french/pocket doors from the dry kitchen when guests arrive. In our case, I imaged the upstairs kitchen to be where we cook, and the basement kitchen to serve more like a dry bar and place for snacks and pizza for movie/game nights.

With a dry kitchen in mind we started getting quotes. What we quickly learned, is that kitchen is expensive! Even so tiny, quotes we got were somewhere between $20000 to $40000. $20000, for installing a sink, some cabinets and countertop, and tile some backsplash! As you could imagine, we quickly nix the dry kitchen plan.

How we will go about finishing the utility room now?

We decided at last, without a clear vision for the purpose of the space, is to finish the room the simplest way possible. We can always come in with some DIY effort later, but for now, getting this space dust free is the priority. Below are the main steps we plan to take:

1. Demo the remaining purple drywall and drywall in the closet;
2. Replace plumbing needed and move the floor drain;
3. Framing walls, soffit when necessary, and add a pocket door to the closet;
4. Frame a floor-to-ceiling utility closet to conceal the furnace and water heater;
5. Electrical work necessary;
6. Drywall the ceilings and walls;
7. Paint the ceilings and walls;
8. Continue the NuCore flooring from the media room to the utility room;
9. Trims and baseboard – the entire basement;
10. Create a laundry nook with cabinet storage.

IMG_5761

So here they are, our current plan for attack in the utility room. We are still talking to a contractor about his availability, and this project will likely last the rest of the winter. But when it is finished it will be a great relief to us. We have started the plumbing work and I have been putting the progress on IG stories (under the highlight “AllAboutPlumbing”). Check it out, guys!