The Kitchen Progress: Countertops and backsplash

People say that the last mile is the longest, now I feel it. It only took 6 weeks for our kitchen renovation to match from demo to cabinet installation. Now 4 more weeks later, we still do not have a working kitchen yet. It isn’t anyone’s fault – we have been travelling for work and family functions and our contractor unfortunately contracted COVID. Fortunately there is good progress to share – since last time I showed you the new cabinets, the countertop and backsplash have been installed!

The Quartz countertop

IMG_7447

IMG_7435

IMG_7433

How do you like the new countertop? This is the Hanstone quartz in color “Montauk“. We purchased it from a local stone shop who did an excellent job installing it. We can hardly tell where the seam is:

IMG_7443

We chose 1/4 inch bevel on the edge and 1.5 inch overhang from the cabinet. I think the countertop profile looks classic and timeless.

IMG_7434

The stone shop also produced window stools using the leftover materials on our slab. We did not know it was an option until we asked at the stone shop. I really think it helped the kitchen to look more cohesive and therefore more calm.

IMG_7458

IMG_7436

The sink installation

With the countertop installation, the crew also installed the sink.

IMG_7459

We chose a single sink for a smaller footprint, which still fits most of our pots and pans. The undermount sink was installed from the bottom using clips and glue.

IMG_7439

We also chose a single faucet for a simpler look. It is beefy and has a retractable sprayer. I think it will serve us well.

IMG_7457

Before our contractor caught the bug, he had started installing the sink plumbing. The new garbage disposal is hooked up to the sink. We are just waiting for the dishwasher drain to be connected in order to use the sink again.

IMG_7440

The splurge in the kitchen

What our contractor did manage to finish before his time off was the backsplash! We had no idea what style and color of backsplash to use for a long time. But as soon as the countertop was in, the choice became easy. We took a bunch of samples home – over 20 pieces of different styles, put them against the cabinets and countertops. And the answer just revealed itself.

IMG_7446

The tile is the Bianco Carrara Hexagon Polished Marble Mosaic from Floor and Decor, and the grout color is “rolling fog”. Marble tile is not cheap. And we have 54 sqft to tile because I wanted the backsplash behind the range hood to reach the ceiling. But I think it is OK to have one splurge in every space we create – we save from doing so much DIY work on the house, and the money we saved should be devoted to things we truly appreciate. In this kitchen, it is the backsplash tile which you see immediately walking into the house. This marble tile is substantial and definitely brings the wow factor.

IMG_7448

Unpacking the kitchen!

IMG_7451

As soon as the backsplash tiles was sealed (marble tiles need to be sealed every a couple years), I wiped down the cabinets and started unpacking! The first cabinet I restocked was the tea cabinet. So happy we chose the glass door design.

IMG_7445

Small appliances we use daily such as microwave, multi-cooker, and water kettle were placed along the cabinet wall. We added many outlets along this wall with these appliances in mind, so when they are situated, the power cable can be hidden from the plain view.

IMG_7463

IMG_7464

I was excited to hang the first poster frame in the kitchen. This is actually a piece of tile from Slav’s hometown, with the castle (yes, his hometown has a huge castle which has its own church and prison!) pictured on the tile. The color of the frame was actually my inspiration for the kitchen cabinet. 🙂

IMG_7454

Bowls and plates, utensils, and pots and pans were all situated in the kitchen cabinets. We did pare down before packing the kitchen. So what we have here are all the cookware we truly love.

IMG_7466

IMG_7467

IMG_7465

We asked for 12″ overhang on two sides of the island for more seating options. The long overhang is also perfect to tuck in Roxie’s food and drink station:

IMG_7456

I really love the island:

IMG_7460

IMG_7455

The current to-dos

So, this is the kitchen we are living in today! Our contractor will come back in the next week or so (as soon as he tests negative) to finish the sink plumbing and connect the appliances, and Slav will be connecting the gas stove and installing the range hood. We forgot to prepare electrical for the range hood, which means there will be one more trip to the attic hopefully the last time – then we will have a fully functional kitchen! So close!

The current to-do list:

  1. Demoing the kitchen and the dividing walls between kitchen and living room. All existing tile, drywall, and floor will be removed including soffit.
  2. Demoing the hall closet space for housing the fridge.
  3. Running utilities – installing new gas line for the new gas stove, adding new plumbing and waterline for the fridge and dishwasher, modifying plumbing and waterline for the new sink and garbage disposal, rerouting the hood vent in the attic.
  4. Slav wiring for outlets and switches.
  5. Tiling the floor.
  6. Adding exterior insulation and installing drywall; repairing ceiling drywall and skim-coat the existing walls.
  7. Installing stair railing.
  8. Priming and painting all the new drywall in the kitchen and stairwell.
  9. Installing recessed lighting for the kitchen and the living room.
  10. Cabinets installation.
  11. Countertop template and installation.
  12. Tiling the backsplash and installing window stools.
  13. Fridge and dishwasher installation. Sink plumbing hookup (hopefully soon).
  14. Installing the gas stove and range hood (hopefully this weekend).
  15. Island outlet and HVAC return panels installation.
  16. Under the cabinet lighting!
  17. Door trims, moulding, and baseboards. Touch paint where it is needed.

The Kitchen: Cabinet Installation

The cabinets are in, and it starts feeling like a proper kitchen again.

IMG_7394

IMG_7402

IMG_7355

IMG_7360

IMG_7398

After wrapping up the electrical work, we spent a couple days tidying up the house. We sold the sofa which was supposed to be a placeholder but lasted over four years! And the living room was clean and nicely empty for a day – until the cabinets arrived.

It was surprising how much space these boxes took. Our living room was filled to the brim. Fortunately, our contractor immediately started installing them, which took three full days.

IMG_7383

Day 1: Installing the lower cabinets

Our contractor started with the corner cabinets and worked his way out. Right off the bat, this first cabinet threw him a curved ball. It turned out that our cabinet designer did not take the existing sink plumbing into consideration. The corner cabinet covered the existing sink plumbing, which should be inside the adjacent sink cabinet. Our contractor had to move the plumbing and waterlines a few inches to the right.

IMG_7413

After the cornet cabinet went in, the sink cabinet followed, then the two 12″ units went in. A filler was added between the sink cabinet and the smaller units to make sure that the gas stove will be centered on the wall between the windows.

IMG_7347

Despite the walls and floors are all new, the sink/stove wall is still wavy and lots of shims had to be used:

IMG_7415

Day 2: Fridge cabinet and the island

The rest of the lower cabinets went in on the second day of installation. The fridge cabinets were put in not without a fight. It took two strong man to hold the tall panels up while many L-brackets were screwed in. The top cabinets were secured to the side panels with screws inside and L brackets at the bottom.

IMG_7387

I cannot tell you how much planning and measuring it took to decide the final dimension for the fridge alcove. Honestly, up until it was installed, I had been nervous about if the fridge is gonna sit well inside… Slav stayed home and installed it with our contractor. I think they nailed down the details. The side panels were lined up almost perfectly with the two walls and the floor tile line, and the overhead cabinets were nicely centered with half an inch filler on both sides.

IMG_7344

Here is the view I am most excited about – from the front door/living room side! We used to have a hall closet facing the front door, which had no design value to speak of. Improving the look of this wall facing front door has always been one of my motivations to renovate the kitchen. We will extend the baseboard to cover the bottom of the panel as a finishing touch. And as of the wall itself, I think it is a great backdrop for a large vertical art piece. Do you agree?

IMG_7392

Between the fridge and the corner cabinet, two 15″ units were installed. A dishwasher will be located between them. These cabinets will be used for utensils and cutleries for easy unloading of the dishwasher.

IMG_7386

Then the island was installed! It comprises three cabinets: one wide (36″) cabinet facing the stove for cooking utensils, and pots and pans, and two 24″ wide cabinets sit back to back as pantry storage. We lived in houses with island before and always liked them. I am so glad that we could accommodate one in our own kitchen.

IMG_7361

Our contractor grouped the cabinets together, and pinned them down with big bolts through the tiles. Oh my, it looked so brutal.

IMG_7343

Inside the cabinets are the HVAC air returns. The bottom of the cabinets had to be cut open. And  we will install the return cover into the side panels.

IMG_7416

This was what the kitchen looked like by the end of the second day. The upper cabinets were still yet to be installed, but we already got a good feeling of the space. 🙂

IMG_7340

IMG_7348

Honestly, I was a bit surprised how wide the walkways are between the island and other wall cabinets. The distances are actually pretty standard for our time – around 42 inches. But I think our kitchen is small so 42″ feels really wide! We know that countertop will be 1.5 inches passing the cabinet fronts on either side, and the fridge and the stove will come into the room a bit too. Hopefully after everything is installed, we will not feel that the walkways are too wide to work with.

IMG_7349

Day 3: Installing upper cabinets and trims

The last day of the cabinet installation went smoothly and quickly. The uppers were put up in merely a couple hours. These cabinets were designed to fill the wall. At the end, only a narrow filler piece was used on the very right.

IMG_7373

Removing the soffit enabled us to install these 36″ tall uppers, which look much better compared to the old 24″ cabinets. All the five uppers have identical width for a more uniform look. Just to make things appear to be lighter, we ordered a glass door for the middle cabinet. Pretty drinkware will be displayed here, and dishes and cookware will populate the other four.

IMG_7367

As you can see, these uppers are directly above the dishwasher. I think putting away dishes and cups will be a breeze.

IMG_7403

The ceiling trims, toe kicks, and baseboard were also installed on the last day.

IMG_7389

IMG_7384

IMG_7358

I am glad that I painted the wall behind the fridge and dishwasher dark. I am not sure how much we would be able to see the wall once the appliances are in, but having a darker color back here puts my mind at ease.

IMG_7366

Can you imagine a whole wall of pretty tiles between the windows, with oversized range hood over a stainless steel stove? It is going to be so pretty!

IMG_7402

The cabinets and hardware

We are so happy with the color and door style of our cabinets. The style is called Clarke, which offers a classic trim design but a full overlay. The cabinet color is Maritime, which sounds like a deep blue. But in person, it has a green undertone and I think it is a perfect blend of dark blue, green, and grey.

IMG_7407

It is interesting to watch how the color changes throughout the day with different lighting. In bright morning light, it appears to be an earthy green, and as the natural lighting gets darker in the afternoon, the blue started appear. At night, when all lights were off, the cabinets look almost gun powder black. And with the recessed lighting on, it looks blue/grey again. I love it.

IMG_7414

We have picked the hardware for the cabinets – these bronze knobs will be installed on both drawers and doors. We will have them installed when our contractor come in again to tile backsplash.

Restoring the normality, slowly but steadily

With the cabinets installed and a whole trailer of cardboard out of the way, we did some deep cleaning around the house. Our offices are finally back in order:

IMG_7339

IMG_7336

We also moved the temporary kitchen from the basement utility room to the living room, and all the (heavy) boxes of kitchen stuff inside from the garage inside. Finally, all kitchen stuff are together again! We are still not cooking due to the difficulty of washing pots and pans, but not for long!

IMG_7337

Roxie has been locked in the basement during the day when the contractor worked on the kitchen. I think she appreciates having her “neighborhood-watch spot” back.

IMG_7338

Moving forward, countertops!

The day after these cabinets were installed, the countertop company came in and did the template. Our quartz countertop will be installed TODAY! Then, our contractor can tile the backsplash and hook up the appliances. I can finally see the finish line and it is not far.

IMG_7355

The current to-do list:

  1. Demoing the kitchen and the dividing walls between kitchen and living room. All existing tile, drywall, and floor will be removed including soffit.
  2. Demoing the hall closet space for housing the fridge.
  3. Running utilities – installing new gas line for the new gas stove, adding new plumbing and waterline for the fridge and dishwasher, modifying plumbing and waterline for the new sink and garbage disposal, rerouting the hood vent in the attic.
  4. Slav wiring for outlets and switches.
  5. Tiling the floor.
  6. Adding exterior insulation and installing drywall; repairing ceiling drywall and skim-coat the existing walls.
  7. Installing stair railing.
  8. Priming and painting all the new drywall in the kitchen and stairwell.
  9. Installing recessed lighting for the kitchen and the living room.
  10. Cabinets installation.
  11. Countertop template and installation (today!).
  12. Tiling the backsplash and installing window stools.
  13. Appliances installation (Contract work ends here).
  14. Slav installing the HVAC return panels on island cabinets.
  15. Slav installing the under the cabinet lighting (his pet project).
  16. Finishing the kitchen and stairwell with door trims, moulding, and baseboards.

Installing Recessed Lights to the Main Floor

Since last time we were in the kitchen together, we have crossed a couple big ticket items off the to-do list:

  1. Demoing the kitchen and the dividing walls between kitchen and living room. All existing tile, drywall, and floor will be removed including soffit.
  2. Demoing the hall closet space for housing the fridge.
  3. Running utilities – installing new gas line for the new gas stove, adding new plumbing and waterline for the fridge and dishwasher, modifying plumbing and waterline for the new sink and garbage disposal, rerouting the hood vent in the attic.
  4. Slav wiring for outlets and switches.
  5. Tiling the floor.
  6. Adding exterior insulation and installing drywall; repairing ceiling drywall and skim-coat the existing walls.
  7. Installing stair railing.
  8. Priming and painting all the new drywall in the kitchen and stairwell.
  9. Installing recessed lighting for the kitchen and the living room.
  10. Cabinets installation (90% done!).
  11. Countertop template and installation.
  12. Tiling the backsplash and finish window trims.
  13. Appliances installation.
  14. Installing under the cabinet lighting.
  15. Finishing the room with door trims and baseboards.

Yes, you read that right. We are almost done with the cabinet installation! Our contractor still needs to put on some trims and decorative moulding. And I will come back next week to show you the complete installation. What I want to talk about today, is the work Slav has been working on during the past three weeks: installing recessed lighting for the kitchen and living room.

IMG_7312

Installing kitchen recessed lighting

We have been wanting recessed lighting for the main floor ever since we installed them in our basement suite. They are so nice to have when you want to brighten up the space for activities and gatherings, while the dimmer function makes moody lighting possible. The question has always been how many to install and what the layout should be. Now we have set on the new kitchen design, we could finally pinpoint where these recessed lights should be.

20220416_150347_HDR

After discussing the lighting location, we marked them on the ceiling, then Slav drilled from below and used utility flags to mark the locations in the attic. We decided to install six of 6″ cans over the 10′ x 11′ floor space (without the cabinets), plus two 4″ cans directly above the two windows as task lighting.

20220416_160911_HDR

With the flags poking out of the insulation in the attic, Slav were able to locate them quickly and cut the openings from above.

20220416_173104

He then attached the cans to the bottom chord of the roof trusses, and wired all six of the 6″ cans in a daisy-chain fashion.

20220416_173952

20220416_205410_HDR

It took a whole afternoon to complete all the wiring and installation. And this is the final results!

20220417_113716_HDR

When Slav wired for the kitchen electrical a couple weeks ago, he prepared switches for the recessed lighting with wires going into the attic. After all the can lights were linked, he connected the circuit to the switch, and everything worked immediately:

IMG_7324

The two tasking lighting above the windows were put on a separate circuit. These lights are turned on by a switch next to the sink, while the six bigger can lights are controlled by two 3-way switches installed at each end of the kitchen.

IMG_7319

Living room recessed lighting installation

The following weekend, Slav repeated the same procedure in the living room:

IMG_7326

The above picture showed 12 markings, but we ended up installing only eight recessed lights. These 65W-equivalent recessed lights provide pretty good coverage. If we ever want to make the room brighter, we could upgrade the lights to 75W- or even 90W-equivalent down the road.

IMG_7323

Typical Slav, repurposing my wine (plastic) cup for less drywall dust. 🙂

20220423_184501

Here is the final results! It took only a few hours to install all eight lights in the living room, but probably equal amount of effort to patch these 12 holes. Ha!

IMG_7352

The living room did not have overhead lighting before. Per fire code, there needs to be some form of light that can be switched on at the front door. So the previous owner wired a wall outlet to a switch next to the front door, and connected a floor lamp to it. It is a rather creative approach to satisfy the code, but not very practical in my mind. Since we had to open some drywall to add switches for the new recessed lights, Slav took the opportunity to rewire the outlet so it stays constantly “hot”.

IMG_7322

As you can see, now we have three switches at the front entry: the leftmost switch controls the outdoor porch light, and the rest two are for the two new circuits for recessed lighting.

IMG_7351

The two cans closest to the front door are on their own circuit. The recessed lighting we installed in the living room has a night light function, so we can keep the front door area lit for the night if needed.

20220416_220721

We have been living with all sixteen recessed lighting in our living space for a week. They are pretty nice! The living room felt a lot bigger at night now it is well-lit. For darker lighting we could simply dim all the lights, use the night light function in the living room, or just to leave the task lighting on. There are so many combination already, and we still have the under-the-cabinet lighting to add into the mix!

IMG_7354

Finally, a mirror in the main floor bathroom!

Speaking of lighting, Slav also added a backlit LED mirror in the guest bathroom. The new mirror offers several light colors with different brightness, and an anti-fog function, all of which are controlled by the three touch buttons on the mirror.

IMG_7329

IMG_7332

The clivia miniata started blooming a couple days ago. I think the mirror and pretty blooms completed the bathroom quite elegantly. Don’t you think?

IMG_7333

What’s in store next

As I speak, our contractor is finishing the cabinets installation, and we will have the countertop templated tomorrow! For the countertop installation we went with a local mom-and-pop stone shop, which operates a lot quicker than big box stores. Our quartz countertop will get installed in just a week after template appointment, then we can start tiling the backsplash and installing appliances. 🙂 We feel so relieved now we can see the end of the finish line, and personally, watching the to-do list getting shorter is so satisfying.

Here is what is left to do in the kitchen:

  1. Countertop template (tomorrow!) and installation (in a week!).
  2. Tiling the backsplash and finish window trims (targeted to finish by mid-May).
  3. Appliances installation.
  4. Unpacking the kitchen (the part I am most looking forward to!).
  5. Slav installing the under-the-cabinet lighting.
  6. Trimming doorways and completing baseboards.

I can totally see us cooking in the new kitchen on the Memorial Day. Maybe not everything on the current to-do list will be complete, but I think the kitchen will be functional enough by the end of May. What do you think? I cannot wait!